New Bridge on river Po
Details
Technical and economic feasibility plan
Location
Parma (PR) River Po , Casalmaggiore – Colorno
Principal
Parma Provincial Administration
Team
Politecnica Ingegneria ed Architettura Soc. Coop., Matildi + Partners, Studio Mattioli
Activities
Tender for the technical and financial feasibility design of a new bridge over the River Po
Time period
2022
New seventh bridge over Rio Douro
Details
Technical and economic feasibility plan
Location
Porto (Portugal)
Rio Douro
Principal
Metro do Porto
Team
Italferr – Matildi+Partners srl – CFA – Cerejeira Fontes Architects
Activity
Gara di progettazione nuovo ponte
Time Period
2021
New Bridge over the River Magra
Details
Beam Bridge
Construction Management Support, Executive plan , Final design plan , Technical and economic feasibility plan
Location
SS 330 “Buonviaggio”
Principal
ANAS S.p.A
Contracting company
Sales SpA & Italscavi di Pratelli Alvaro & C. Sas
Fincantieri Infrastructure (metal works)
Fagioli SpA (transportation and hoisting)
Team
Politecnica Ingegneria ed Architettura Soc. Coop.
Technital S.p.A.
Matildi+Partners srl
Activities
Technical and financial feasibility plan,
Final design plan (deck)
Executive plan (scaffolding)
Assistance to construction management
Time Period
2021 – 2022
Extent and spans
291 m | 57+90+90+54
Bridge over Bevano stream
Details
Beam Bridge
Construction Management Support, Executive plan
Location
S.S.3bis “Tiberina” 236+VI km
San Zaccaria (RA)
Principal
MONACO S.p.A.
Contracting company
IMPRENDITORI ASSOCIATI s.r.l.
(in association with MONACO S.p.A.)
BIT S.p.A. (metal works)
Team
Matildi+Partners srl
Activities
Construction plan (supplementary technical bypass report) – deck
Construction plan (supplementary technical bypass report) – shoulder reinforcement
Assistance to construction management
Time Period
2021
Extent and spans
87.2 m
23.6+40+23.6
Bridge II Giugno over the Misa
Details
Beam Bridge
Executive plan
Location
Connecting the two banks between Portici Ercolani and Via XX Settembre
Senigallia – AN
Principal
Land Reclamation Consortium of Marche
Contracting company
- F&I Lavori Soc. Coop.
- Cimolai S.p.A. (metal works)
Team
- BME Bonifica Marche Engineering srl
- Matildi+Partners srl
Activities
Detailed executive plan (deck)
Time Period
2020 – 2021
Extent and spans
35.5 m
Bridge over the Rienza
Details
Gantry Bridge
Executive plan , Final design plan
Location
New access to Val Badia with bridge over the Rienza and Floronzo tunnel – Bosco del convento lot – S.S. 244 “Val badia” – San Lorenzo di Sebato (BZ)
Principal
Cimolai S.p.A
Contracting company
- Strabag S.p.A.
- Alpenbau Srl
- Unionbau S.p.A.
- Moser&Co Srl
- GeObau Srl
Team
- MC Engineering
- Matildi+Partners srl
Activities
Executive plan (scaffolding)
Time Period
2019-2021
Extent and spans
147 m | 59+85
Arch Bridge over Gravina
Details
Arch Bridge
Executive plan
Location
S.S. 655 “Bradanica” 137+VII km
Locality of La Martella (MT)
Principal
CIMOLAI S.p.A.
Contracting company
ALEANDRI S.p.A.
Cimolai S.p.A. (metal works)
Team
Matildi+Partners srl
Activities
Executive plan (technical bypass report) – deck
Construction plan – deck
Acceptance testing assistance
Time Period
2013-2015
Extent and spans
142 m
Barragiones Viaduct
Details
Beam Bridge
Executive plan
Location
Circonvallazione di Cuglieri (OR) – bypass to S.S. 292
Principal
PREVE Costruzioni S.p.A
Contracting company
PREVE Costruzioni S.p.A
Team
Matildi+Partners srl
Activities
Executive plan (scaffolding)
Time Period
2014-2017
Extent and spans
208 m
64+80+64
S.S. 199 Sassari - Olbia Lot 7
Details
Beam Bridge
Location
SS 199 “Monti” – from 61+600 km to 68+600 km
Olbia – SS
Principal
ANAS S.p.A
Contracting company
Oberosler cav. Pietro S.p.a.
Team
Matildi+Partners srl
Activities
Executive plan (scaffolding)
Time Period
2014 – 2016
Designed Works
5 Viaducts
– VI01 – Su Gugguttu Viaduct
– VI02 – Cannalzos Bridge
– VI03 – Rio San Michele Viaduct
– VI04 – Rio San Michele Viaduct Secondary road
– VI05 – Sa Piana Viaduct
Bridge over Aulella stream
Details
Beam Bridge
Executive plan , Final design plan
Location
SS 63 “Cerreto”
Aulla (locality Serricciolo) – MS
Principal
ANAS S.p.A
Contracting company
EDILTURCI S.r.l.
COMETAL S.r.l.
Maeg Costruzioni SpA (metal works)
Fagioli SpA (transportation and hoisting)
Team
Matildi+Partners srl
Activities
Technical and financial feasibility plan,
Final design plan
Executive plan
Time Period
2013
Extent and spans
66 m
Marmore Bridge
Details
Arch Bridge
Executive plan
Location
SS 79 bis “Ternana” overpassing the Valnerina
Principal
ANAS S.p.A
Contracting company
Consorzio Stabile UNITER (civil works) Maeg s.p.a.(metal fabrication)
Team
Plan executed by Matildi+Partners srl
A.T.P.: S.T.E.srl – SAB engineering – AGT ingegneria – AI engineering – Golder – AI Studio – Progter .
Activities
Executive design plan (deck and foundations)
Time Period
2006 – 2010 (inaugurated in 2013)
Extent and spans
Total length 300 m – height 70m – Main arch span 170m
Sangro Viaduct
Details
Beam Bridge
Executive plan
Location
Sangro Viaduct – S.S. No.652 “Fondovalle Sangro” (CH)
Principal
TECNIS S.p.A
Contracting company
TECNIS S.p.A.
Team
- COGIP S.r.l
- Eng. PAVESI & C. S.p.A.
Matildi+Partners srl
Activities
Executive plan (scaffolding)
Time Period
2007-2011
Extent and spans
346 m | 58+92+92+60+44
Castiglione 1 Viaduct
Details
Beam Bridge
Executive plan
Location
SS 17 Var. “Appulo-Sannitica”
Rionero Sannitico (Castiglioni) – IS
Principal
ANAS S.p.A
Contracting company
- SISt
- Ortolan Spa
Team
Matildi+Partners srl
Activities
Executive plan (deck and substructures)
Time Period
2001 – 2011
Extent and spans
274 m | 137 + 137
Scalilli Viaduct
Details
Beam Bridge
Executive plan
Location
Monreale (PA) – S.S. No.118 “Corleonese – Agrigentina”
Principal
TECNIS S.p.A
Contracting company
- TECNIS S.p.A.
- COGIP S.r.l.
- SIGENCO S.p.A.
Team
- Matildi+Partners S.r.l.
- TECNIS S.p.A.
- SAB Engineering S.r.l.
Activities
Executive plan (scaffolding)
Time Period
2007-2010
Extent and spans
140 m | 30+40+40+30
Lemène Viaduct
Details
Beam Bridge
Executive plan
Location
Portogruaro (VE) – S.S. N.14 “Della Venezia Giulia” – Portogruaro Bypass
Principal
ANAS S.p.A
Contracting company
- TECNIS S.p.A.
- MBM S.p.A.
- RICCIARDELLO Costruzioni
Team
Matildi+Partners srl
Activities
Executive plan (scaffolding)
Time Period
2005 – 2009
Extent and spans
575 m | 31+57+57+57+57+57+57+57+57+57+31
Cable-stayed bridge over the River Adda
Details
Cable-stayed bridge
Executive plan
Location
Cable-stayed bridge over the river Adda at Montodine (CR) – S.P. No. 591 “Cremasca”
Principal
Tecnis S.p.A.
A.N.A.S. S.p.A.
Contracting company
Tecnis S.p.A.
Cogip
PSP
Team
Technical Office Eng. Giorgio Romaro
Matildi + Partners s.r.l.
Activities
Executive Plan
Time Period
2001 – 2009
Extent and spans
400 m | 75+252+75 m
Granatieri di Sardegna Bridge
Details
Beam Bridge
Executive plan
Location
S.S. No. 14 “della Venezia Giulia”
San Donà di Piave – VE
Principal
Tecnis S.p.A. & SI.GEN.CO. S.p.A.
Contracting company
Tecnis S.p.A. & SI.GEN.CO. S.p.A.
MAEG Costruzioni S.p.A. (metal fabrication and assembly)
Team
Studio Matildi
Activities
Detailed executive design plan
Time Period
2005 – 2008
Extent and spans
484 m | 92+100+100+100+92
Cadore Bridge over the River Piave
Details
Arch-frame bridge
Executive plan
Location
S.S. 51 “Alemagna”
Pieve di Cadore – BL
Principal
Cimolai S.p.A
Contracting company
Mazzi SpA Verona
Cimolai SpA (metal works)
Team
Studio Matildi (Prof. Eng. Pietro Matildi, Doc. Eng. Giuseppe Matildi)
Doc. Ing. Antonio Gentile
Activities
Executive and detailed design plan (deck)
Time Period
1980 – 1985
Extent and spans
270 m | 71+128+71