List
Map
Filter
Sort by:
Structural tipology:
Design level:
Open list Hide list
New Bridge on river Po
New Bridge on river Po
New Bridge on river Po
New Bridge on river Po
Technical and economic feasibility plan

Find out more
New seventh bridge over Rio Douro
New seventh bridge over Rio Douro
New seventh bridge over Rio Douro
New seventh bridge over Rio Douro
Technical and economic feasibility plan

Find out more
New Bridge over the River Magra
New Bridge over the River Magra
New Bridge over the River Magra
New Bridge over the River Magra
Beam Bridge

Construction Management Support, Executive plan
, Final design plan
, Technical and economic feasibility plan

Find out more
Bridge over Bevano stream
Bridge over Bevano stream
Bridge over Bevano stream
Bridge over Bevano stream
Beam Bridge

Construction Management Support, Executive plan

Find out more
Bridge II Giugno over the Misa
Bridge II Giugno over the Misa
Bridge II Giugno over the Misa
Bridge II Giugno over the Misa
Beam Bridge

Executive plan

Find out more
Bridge over the Rienza
Bridge over the Rienza
Bridge over the Rienza
Bridge over the Rienza
Gantry Bridge
Executive plan
, Final design plan

Find out more
Arch Bridge over Gravina
Arch Bridge over Gravina
Arch Bridge over Gravina
Arch Bridge over Gravina
Arch Bridge

Executive plan

Find out more
Barragiones Viaduct
Barragiones Viaduct
Barragiones Viaduct
Barragiones Viaduct
Beam Bridge

Executive plan

Find out more
S.S. 199 Sassari - Olbia Lot 7
S.S. 199 Sassari - Olbia Lot 7
S.S. 199 Sassari – Olbia Lot 7
S.S. 199 Sassari - Olbia Lot 7
Beam Bridge

Find out more
Bridge over Aulella stream
Bridge over Aulella stream
Bridge over Aulella stream
Bridge over Aulella stream
Beam Bridge

Executive plan
, Final design plan

Find out more
Marmore Bridge
Marmore Bridge
Marmore Bridge
Marmore Bridge
Arch Bridge

Executive plan

Find out more
Sangro Viaduct
Sangro Viaduct
Sangro Viaduct
Sangro Viaduct
Beam Bridge

Executive plan

Find out more
Castiglione 1 Viaduct
Castiglione 1 Viaduct
Castiglione 1 Viaduct
Castiglione 1 Viaduct
Beam Bridge

Executive plan

Find out more
Scalilli Viaduct
Scalilli Viaduct
Scalilli Viaduct
Scalilli Viaduct
Beam Bridge

Executive plan

Find out more
Lemène Viaduct
Lemène Viaduct
Lemène Viaduct
Lemène Viaduct
Beam Bridge

Executive plan

Find out more
Cable-stayed bridge over the River Adda
Cable-stayed bridge over the River Adda
Cable-stayed bridge over the River Adda
Cable-stayed bridge over the River Adda
Cable-stayed bridge
Executive plan

Find out more
Granatieri di Sardegna Bridge
Granatieri di Sardegna Bridge
Granatieri di Sardegna Bridge
Granatieri di Sardegna Bridge
Beam Bridge

Executive plan

Find out more
Cadore Bridge over the River Piave
Cadore Bridge over the River Piave
Cadore Bridge over the River Piave
Cadore Bridge over the River Piave
Arch-frame bridge

Executive plan

Find out more

New Bridge on river Po

Details

Drafting of a technical and financial feasibility design plan pursuant to Article 23(5) of the code for the construction of a new bridge crossing the river Po between the localities of Casalmaggiore (province of Cremona) and Colorno (province of Parma)
Design level:
Technical and economic feasibility plan


Location

Parma (PR) River Po , Casalmaggiore – Colorno

Principal

Parma Provincial Administration

Team

Politecnica Ingegneria ed Architettura Soc. Coop., Matildi + Partners, Studio Mattioli

Activities

Tender for the technical and financial feasibility design of a new bridge over the River Po

Time period

2022

New seventh bridge over Rio Douro

Details

International public tender for the design of new seventh bridge over Rio Douro, for the new route between the metropolitan areas of Campo Alegre (city of Porto) and Vila Nova de Gaia (city of Candal)
Design level:
Technical and economic feasibility plan


Location

Porto (Portugal)

Rio Douro

Principal

Metro do Porto

Team

Italferr – Matildi+Partners srl – CFA – Cerejeira Fontes Architects

Activity

Gara di progettazione nuovo ponte

Time Period

2021

New Bridge over the River Magra

Details

Plan for the reconstruction of the bridge over the river Magra that collapsed on 8 April 2020, connecting Albiano Magra and Caprigliola on S.S. 330 “Buonviaggio”
Structural tipology:
Beam Bridge

Design level:
Construction Management Support, Executive plan
, Final design plan
, Technical and economic feasibility plan


Location

SS 330 “Buonviaggio”

Principal

ANAS S.p.A

Contracting company

Sales SpA & Italscavi di Pratelli Alvaro & C. Sas

Fincantieri Infrastructure (metal works)

Fagioli SpA (transportation and hoisting)

Team

Politecnica Ingegneria ed Architettura Soc. Coop.
Technital S.p.A.
Matildi+Partners srl

Activities

Technical and financial feasibility plan,

Final design plan (deck)

Executive plan (scaffolding)

Assistance to construction management

Time Period

2021 – 2022

Extent and spans

291 m | 57+90+90+54

Bridge over Bevano stream

Details

Construction plan for the bridge over the Bevano stream, located at 236+VI km on the S.S.3bis "Tiberina"
Structural tipology:
Beam Bridge

Design level:
Construction Management Support, Executive plan


Location

S.S.3bis “Tiberina” 236+VI km

San Zaccaria (RA)

Principal

MONACO S.p.A.

Contracting company

IMPRENDITORI ASSOCIATI s.r.l.

(in association with MONACO S.p.A.)

BIT S.p.A. (metal works)

Team

Matildi+Partners srl

Activities

Construction plan (supplementary technical bypass report) – deck

Construction plan (supplementary technical bypass report) – shoulder reinforcement

Assistance to construction management

Time Period

2021

Extent and spans

87.2 m

23.6+40+23.6

Bridge II Giugno over the Misa

Details

Reconstruction plan of Bridge II Giugno (now called "Ponte Angeli dell'8 dicembre 2018") over the river Misa in Senigallia
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

Connecting the two banks between Portici Ercolani and Via XX Settembre

Senigallia – AN

Principal

Land Reclamation Consortium of Marche

Contracting company

  • F&I Lavori Soc. Coop.
  • Cimolai S.p.A. (metal works)

Team

  • BME Bonifica Marche Engineering srl
  • Matildi+Partners srl

Activities

Detailed executive plan (deck)

Time Period

2020 – 2021

Extent and spans

35.5 m

Bridge over the Rienza

Details

Detailed design of the composite steel-concrete deck of the bridge over the River Rienza as part of the works for the completion of a new access road in Val Badia, lot Bosco del Convento, on S.S. 244 “Val badia”
Structural tipology:
Gantry Bridge
Design level:
Executive plan
, Final design plan


Location

New access to Val Badia with bridge over the Rienza and Floronzo tunnel – Bosco del convento lot – S.S. 244 “Val badia” – San Lorenzo di Sebato (BZ)

Principal

Cimolai S.p.A

Contracting company

  • Strabag S.p.A.
  • Alpenbau Srl
  • Unionbau S.p.A.
  • Moser&Co Srl
  • GeObau Srl

Team

  • MC Engineering
  • Matildi+Partners srl

Activities

Executive plan (scaffolding)

Time Period

2019-2021

Extent and spans

147 m | 59+85

Arch Bridge over Gravina

Details

Executive and construction plan for the bridge over the Gravina stream
Structural tipology:
Arch Bridge

Design level:
Executive plan


Location

S.S. 655 “Bradanica” 137+VII km

Locality of La Martella (MT)

Principal

CIMOLAI S.p.A.

Contracting company

ALEANDRI S.p.A.

Cimolai S.p.A. (metal works)

Team

Matildi+Partners srl

Activities

Executive plan (technical bypass report) – deck

Construction plan – deck

Acceptance testing assistance

Time Period

2013-2015

Extent and spans

142 m

 

Barragiones Viaduct

Details

Improvement bypass to the executive plan of composite steel-concrete deck of the Barragiones viaduct
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

Circonvallazione di Cuglieri (OR) – bypass to S.S. 292

Principal

PREVE Costruzioni S.p.A

Contracting company

PREVE Costruzioni S.p.A

Team

Matildi+Partners srl

Activities

Executive plan (scaffolding)

Time Period

2014-2017

Extent and spans

208 m

64+80+64

 

S.S. 199 Sassari - Olbia Lot 7

Details

Detailed executive plan for 5 viaducts in a composite steel-concrete system, of which 4 on the main axis on a dual carriageway and 1 on the ring road on a single carriageway. Current composite system sections consist of pairs of double-T beams with a height of 2 m, working together with concrete slabs between 12 m and 16.75 m wide
Structural tipology:
Beam Bridge


Location

SS 199 “Monti” – from 61+600 km to 68+600 km

Olbia – SS

Principal

ANAS S.p.A

Contracting company

Oberosler cav. Pietro S.p.a.

Team

Matildi+Partners srl

Activities

Executive plan (scaffolding)

Time Period

2014 – 2016

Designed Works

5 Viaducts

– VI01 – Su Gugguttu Viaduct

– VI02 – Cannalzos Bridge

– VI03 – Rio San Michele Viaduct

– VI04 – Rio San Michele Viaduct Secondary road

– VI05 – Sa Piana Viaduct

Bridge over Aulella stream

Details

Reconstruction plan of bridge over the Aulella stream that partially collapsed during the night of 10-11 November 2012 April 2020, located in the hamlet of Serricciolo on state road (S.S.) 63 “Cerreto”
Structural tipology:
Beam Bridge

Design level:
Executive plan
, Final design plan


Location

SS 63 “Cerreto”

Aulla (locality Serricciolo) – MS

Principal

ANAS S.p.A

Contracting company

EDILTURCI S.r.l.

COMETAL S.r.l.

Maeg Costruzioni SpA (metal works)

Fagioli SpA (transportation and hoisting)

Team

Matildi+Partners srl

Activities

Technical and financial feasibility plan,

Final design plan

Executive plan

Time Period

2013

Extent and spans

66 m

 

Marmore Bridge

Details

Plan for new bridge over the river Nera as part of the construction of the Terni (locality S.Carlo) - regional boundary (locality Piè di Moggio) section of the SS79bis on the Civitavecchia - Orte - Terni - Rieti route
Structural tipology:
Arch Bridge

Design level:
Executive plan


Location

SS 79 bis “Ternana” overpassing the Valnerina

Principal

ANAS S.p.A

Contracting company

Consorzio Stabile UNITER (civil works)  Maeg s.p.a.(metal fabrication)

Team

Plan executed by Matildi+Partners srl

A.T.P.: S.T.E.srl – SAB engineering – AGT ingegneria – AI engineering – Golder – AI Studio – Progter .

Activities

Executive design plan (deck and foundations)

Time Period

2006 – 2010 (inaugurated in 2013)

Extent and spans

Total length 300 m – height 70m – Main arch span 170m

Sangro Viaduct

Details

Detailed executive plan of the metal deck of the Sangro viaduct, inside the 2nd lot - 2nd Section - 1st Stretch of S.S. 652 “Fondovalle Sangro”
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

Sangro Viaduct – S.S. No.652 “Fondovalle Sangro” (CH)

Principal

TECNIS S.p.A

Contracting company

TECNIS S.p.A.

Team

  • COGIP S.r.l
  • Eng. PAVESI & C. S.p.A.
    Matildi+Partners srl

Activities

Executive plan (scaffolding)

Time Period

2007-2011

Extent and spans

346 m | 58+92+92+60+44

Castiglione 1 Viaduct

Details

Executive plan of metal deck of Castiglione 1
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

SS 17 Var. “Appulo-Sannitica”

Rionero Sannitico (Castiglioni) – IS

Principal

ANAS S.p.A

Contracting company

  • SISt
  • Ortolan Spa

Team

Matildi+Partners srl

Activities

Executive plan (deck and substructures)

Time Period

2001 – 2011

Extent and spans

274 m | 137 + 137

 

Scalilli Viaduct

Details

Detailed executive plan of the metal deck of the Scalilli viaduct as part of the works for the arrangement and adaptation of the road platform between 18 + 700 km and 24 + 650 km of S.S. No. 118 "Corleonese - Agrigentina"
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

Monreale (PA) – S.S. No.118 “Corleonese – Agrigentina”

Principal

TECNIS S.p.A

Contracting company

  • TECNIS S.p.A.
  • COGIP S.r.l.
  • SIGENCO S.p.A.

Team

  • Matildi+Partners S.r.l.
  • TECNIS S.p.A.
  • SAB Engineering S.r.l.

Activities

Executive plan (scaffolding)

Time Period

2007-2010

Extent and spans

140 m | 30+40+40+30

Lemène Viaduct

Details

Detailed executive plan of the metal deck of the Lemène viaduct, located on S.S. No. 14 and included in the "Portogruaro Bypass" - IV Lot I Segment
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

Portogruaro (VE) – S.S. N.14 “Della Venezia Giulia” – Portogruaro Bypass

Principal

ANAS S.p.A

Contracting company

  • TECNIS S.p.A.
  • MBM S.p.A.
  • RICCIARDELLO Costruzioni

Team

Matildi+Partners srl

Activities

Executive plan (scaffolding)

Time Period

2005 – 2009

Extent and spans

575 m | 31+57+57+57+57+57+57+57+57+57+31

Cable-stayed bridge over the River Adda

Details

Executive plan for the cable-stayed bridge over the Adda river in Montodine (CR)
Structural tipology:
Cable-stayed bridge
Design level:
Executive plan


Location

Cable-stayed bridge over the river Adda at Montodine (CR) – S.P. No. 591 “Cremasca”

Principal

Tecnis S.p.A.

A.N.A.S. S.p.A.

Contracting company

Tecnis S.p.A.

Cogip

PSP

Team

Technical Office Eng. Giorgio Romaro

Matildi + Partners s.r.l.

Activities

Executive Plan

Time Period

2001 – 2009

Extent and spans

400 m | 75+252+75 m

Granatieri di Sardegna Bridge

Details

Executive design plan for the bridge over the River Piave on S.S. No. 14 "della Venezia Giulia" - Completion of the 2nd lot of the Bypass south of San Donà di Piave (VE)
Structural tipology:
Beam Bridge

Design level:
Executive plan


Location

S.S. No. 14 “della Venezia Giulia”

San Donà di Piave – VE

Principal

Tecnis S.p.A. & SI.GEN.CO. S.p.A.

Contracting company

Tecnis S.p.A. & SI.GEN.CO. S.p.A.

MAEG Costruzioni S.p.A. (metal fabrication and assembly)

Team

Studio Matildi

Activities

Detailed executive design plan

Time Period

2005 – 2008

Extent and spans

484 m | 92+100+100+100+92

 

Cadore Bridge over the River Piave

Details

Detailed executive design plan of the Cadore Bridge over the River Piave connecting Tai di Cadore to Caralte
Structural tipology:
Arch-frame bridge

Design level:
Executive plan


Location

S.S. 51 “Alemagna”

Pieve di Cadore – BL

Principal

Cimolai S.p.A

Contracting company

Mazzi SpA Verona

Cimolai SpA (metal works)

Team

Studio Matildi (Prof. Eng. Pietro Matildi, Doc. Eng. Giuseppe Matildi)

Doc. Ing. Antonio Gentile

Activities

Executive and detailed design plan (deck)

Time Period

1980 – 1985

Extent and spans

270 m | 71+128+71