Details
Beam Bridge
Executive plan , Final design plan
Location
SS 63 “Cerreto”
Aulla (locality Serricciolo) – MS
Principal
ANAS S.p.A
Contracting company
EDILTURCI S.r.l.
COMETAL S.r.l.
Maeg Costruzioni SpA (metal works)
Fagioli SpA (transportation and hoisting)
Team
Matildi+Partners srl
Activities
Technical and financial feasibility plan,
Final design plan
Executive plan
Time Period
2013
Extent and spans
66 m
Structural Layout
Structural Layout
Reconstruction plan of bridge over the Aulella stream that partially collapsed during the night of 10-11 November 2012 April 2020, located in the hamlet of Serricciolo on state road (S.S.) 63 “Cerreto”.
The new deck is a supported truss in a composite steel-concrete system with a single-span, 66 m span, twin beam truss design.
The Deck
The Deck
The concrete slab accommodates the road platform and two lateral pedestrian pavements, with a total width of 14.10 m; it is frame worked on the main beams, spaced 9.40 m apart, and on an intermediate pin beam. The slab is cast on 6 mm thick, self-supporting metal predalles, until a total thickness of 22 cm is reached after additional casting.
The beams vary in height from a minimum of 2.00 m in support to a maximum of 2.60 m in span and are connected by means of cross beams with a double-T section placed at a 6.75 m spacing, as well as by an upper bracing with a St. Andrew’s cross pattern.
Assembly
Assembly
Assembly of the deck is carried out by lifting the individual beams from below with the aid of a crane truck, after assembly of the segments on the ground and the use of temporary piers.