MON 19:15 PM
Search
ita
eng
home
history
projects
bridges
roads
tunnels
photogallery
1970 - 1984
1985 - 1992
1993 - 1995
1996 - 1999
2000 - 2002
2003 - 2004
2005 - 2006
2007 - 2008
map
about us
giuseppe matildi
certifications
projects before 1989
projects between 1989 and 2006
references
contact us
Executive design of the Castiglione 1 viaduct - Isernia - Castel di Sangro expressway (IS) - Variant on S.S no. 17.
Executive design of the Pedemontana road Piana di Gioia Tauro Delianuova - Cinquefrondi - 1st Section - 1st Lot 1 from S. Giorgio M. to the Taurianova junction on S.S. no. 111 dir (RC)
Executive design, Scalilli Viaduct - S.S. no. 118 ”Corleonese - Agrigentina” (PA).
Executive design of the Sangro viaduct - S.S. no. 652 “Fondovalle Sangro” (CH)
Modernisation works on the S.S. no. 64 "della Porrettana" at risk of landslides between with villages of Silla and Marano in the municipality of Gaggio Montano - 2nd section (BO)
Executive design for the modification of motorway sections on the Villesse - Gorizia intersection. (GO)
Construction design for mixed system viaducts in LOT 1 - S.S. no. 38 Morbegno variant, from the Fuentes junction to the Tartano junction. First section from the Fuentes junction to the left of the Bitto river - BRANCH A
Executive design of the stayed bridge over the River Adda at Montodine - S.S. no. 591 "Cremasca" (LO)
Executive design of the Lemène viaduct - S.S. no. 14 - Portogruaro variant 4th Lot 1st Section (VE)
Executive design of the Reghena Viaduct and the Overpass on the roundabout on S.S. no. 53 as part of the works on S.S. no. 14 - Portogruaro variant - 2nd Lot and modification of 1st Lot (VE)
Executive design of the Lagaro Viaduct - A1 "Milano-Napoli" Lot 5b - Stretch from La Quercia to Badia Nuova (BO)
Executive and construction design of the mixed system viaducts on the Vivai expressway - Lot III - Road stretch from Lietolui to Piove di Sacco (PD)
Design of the completion of motorway NSA 339 "Catania - Siracusa" - Stretch between Passo San Martino and 130+400 on S.S. no. 114 (CT)
Executive design of the bridge over the River Piave S.S. no.14 "della Venezia Giulia" - Completion of the 2nd lot of the variant south of San Donà di Piave (VE)
Detailed executive design of the works for the motorway connection on the S.S. no. 527 "Bustese" to S.S. no.11 "Padana superiore" with junction on the A4 (Boffalora -MI exit)
Executive design of the arched bridge over the Valnerina - Civitavecchia-Orte-Terni-Rieti route between Terni (S.Carlo) and the regional boundary (Piè di maggio) (TR)
Executive design of modernisation and modification works type 1/A CNR/80 standard on A3 motorway "Salerno-Reggio Calabria" - 2nd branch - 2nd stretch - 2nd Lot from the Campotenese junction up to but excluding the Morano Calabro junction. (CS)
Executive project and environmental impact study 1st branch - 7th stretch - 7th lot of the A3 motorway "Salerno-Reggio Calabria" (PZ)
Executive design of the bridge over the Tiber at Monterotondo - Road connection between the A1 Dir and S.S. no. 4 "Salaria" at Monterotondo Scalo (Rome)
Executive and construction design of the three lane modification in both directions - North West Quadrant - Lot V (Roma)
Bridge over the river Cimoliana - S.S. no. 251 "della Cannellini e della Val Zoldana" (PN)
Executive design of the reconstruction works on the Primosole Bridge over the river Simeto - S.S. no. 114 - "Orientale Sicula" (CT)
Executive design of the Bridge over the Volturno - S.P. no. 66 "Piedimonte Matese - Briganti bridge - Villa Ortensia" (CE)
Executive design of the Viaduct over the river Stizzon - S.S. no. 50 "del Grappa e Passo Rolle" Variant at Feltre (BL) - 1st lot Fenadora - Anzù
Executive design of the S.Anna Viaduct - Connection from the Vibrata valley to the Tordino valley at S.Nicolò a Tordino – 1st lot – 2nd section – 3rd stretch (TE)
Executive design of S.S. no. 9 "Via Emilia" – Variant around the town of Fidenza – 2nd lot – Between S.S. no. 588 “Dei due ponti” and S.S. no. 9 “Via Emilia” (PR)
Executive design of the Bridge over the San Leonardo river - S.S. no. 114 "Orientale sicula" (CT)
Executive design of the S.S. no. 64 "Porrettana" - Variant at Riola di Vergato - 2nd section (BO)
Executive design of the Ponte nelle Alpi Viaduct - A27 (BL) "Mestre-Belluno"
Executive design of the Fragneto Viaduct - S.S. no. 95 "di Brienza"(PZ)
Executive design of the "Antiche mura" Viaduct at Cittadella - S.S. no. 49 "del Grappa" (PD)
Executive design of the S.G.C. FiPiLi "Firenze-Pisa Livorno" (LI) - Lots 1A, 1B, 1C, 2A, 2B, 2C, 2D and 2E
1
2
3
4
bridges