

-
Roundabout on Gorizia junction: Op.31 and Op.33 (rendering) -
Op.31 (rendering) -
Op.7 ( Rendering) -
Op18-Bridge over the Isonzato Canal - Composite simple support - Span 44 m. (April 2011) -
Op18- Bridge over the Isonzato Canal - Assembly of metal structure (April 2011) -
OP31- Pre-assembly at the factory of the reticular net (April 2011)
Motorway junction Gorizia-Villesse (GO)
BACKExecutive design of composite viaducts for the modification of motorway section at the Villesse - Gorizia junction (GO).
OP5: Motorway overpass, total length 58 m.
OP7: Foot bridge.
OP10: Motorway overpass, total length 58 m.
OP18: Bridge over the Isonzato canal, single span, 44 m.
OP22: Bridge over the River Isonzo, total length 334m, average span 56 m.
OP27: Motorway overpass, total length 60 m.
OP31: Arched bridge - total length 65 m.
OP33: Arched bridge - total length 50 m.
Years: 2008-2011
References:
- ICOP