Night-time view -
Central span -
Dowelling on the abutment S1 (June 2007) -
Reinforcing walls on abutment S2 for stabilisation of the foundations (June 2007)
Bridge at Granatieri di Sardegna - S.S. no. 14 "della Venezia Giulia" (VE)
BACKYears: 2005-2008
References:
- Tecnis S.p.A.
Executive design of the bridge over the River Piave S.S. no.14 "della Venezia Giulia" - Completion of the 2nd lot of the variant south of San DonĂ di Piave (VE). Composite deck with three spans each approx. 80+100+80 m supported at the ends on reinforced concrete brackets on the piers not in the riverbed and in the centre on two piers in the riverbed and other two stretches of deck of approx. 60 m span, included between the pre-stressed concrete segments of the abutments and the piers not in the riverbed, also with a composite structure.